How to Vet a Schramm Drilling Rig Before You Sign: An 8-Step Checklist

1794887515 · Evelyn Hartmann · Crushing & Screening

Who this checklist is for

If you are specifying a rotary drilling rig — water well, geothermal loop field, mineral exploration, or a small oil and gas program — and the name on the quote is Schramm, this is for you. It is written for the person who has to sign off on the purchase order, not the person who is excited about the purchase order.

Eight steps. Maybe two weeks of calendar time if the quotes are already on your desk. None of them are exotic.

For context on where I am coming from: I review every rig specification package that leaves this company — roughly 45 to 60 a year, depending on how the mining cycle treats us. In our Q1 2024 documentation audit I rejected 14% of first-pass packages. Two of those rejections were for standard version drift. One was because the model number on the quote did not match the configuration in the attached manual. That one cost our supplier a $30,000 rework of a documentation set and cost me two weekends. The checklist below is now mandatory before a PO moves.

The 8-step verification checklist

Step 1: Confirm which Schramm you are actually talking to

This sounds like a joke. It is not. Search the name and you will get a Pennsylvania drilling equipment manufacturer, a Mannheim company that shares the surname, Tex Schramm — the former Dallas Cowboys president — plus a scattering of unrelated surnames and at least one set of sports statistics that has nothing to do with anything. That is just how search behaves with common surnames. No harm done, until it hits a contract.

What you want on paper before anything else:

  • The full legal entity name and registered address on the quote
  • The product lines listed — should be rotary drilling rigs, crawler drills, down-hole hammers, and parts and service, not something adjacent
  • The entity name on the bank details matching the entity name on the contract

This is the step basically everyone skips. I skipped it myself until 2022, when a purchase agreement went out with a trading name in the header and a different legal entity in the signature block, and our legal team sent it back with a note that was two sentences long and extremely unpleasant.

Step 2: Build a one-page spec baseline before anyone quotes you

Do not let the quote define the requirement. Write the requirement first, on one page, and send the same page to every vendor.

The page needs: target hole depth, final hole diameter, the formation types you expect to drill through, circulation method, transport constraints (weight and width matter more than people expect on mountain access roads), and power source. On that last point — decide early whether you want diesel or electric. Electric rigs are quieter and cheaper to run where grid power exists, and completely useless where it does not. Do not let that decision get made for you by whatever happens to be on the lot.

Checkpoint: if two vendors quote you two wildly different machines, the problem is usually your baseline, not their judgment.

Step 3: Treat the model number as a starting point, not a specification

When I first started reviewing rig packages, I assumed a model number described a fixed machine. It does not. A designation like T450 or T130 identifies a platform and an approximate class, and the configuration on top of that platform can vary substantially — carrier, mast, rotation head, compressor package, control layout.

Two years of reading configuration sheets taught me the actual rule: the number tells you what family you are in, the configuration sheet tells you what you are buying.

So ask for the configuration sheet with the quote. Every time. Cross-check it line by line against whatever manual or datasheet came attached. That is exactly where the mismatch in our Q1 audit came from — the manual was for a variant with a different mast arrangement than the one being priced.

If the configuration sheet and the manual disagree, stop. Do not assume the newer document is correct. Ask which one applies to the unit being quoted, and get the answer in writing.

Step 4: Ask for the standard, in writing, with a version number

“Meets industry standards” is not a specification. It is a sentence.

For drilling and well servicing equipment, the relevant published documents are API Spec 7K (drilling and well servicing equipment) and API RP 7G (drill stem design and operating limits). Quality management systems are typically certified against ISO 9001:2015. In US mining applications, site-level requirements come from MSHA under 30 CFR Parts 46, 56, 57, 62 and 77, depending on whether the operation is surface or underground. As of January 2025 those are the current editions and parts I would reference in a contract — verify the current revision directly with API and MSHA before you sign, because standards get revised and my list will go stale.

What goes in the contract is not the standard name. It is the standard name plus the edition plus which clauses apply to your rig. A supplier who cannot produce that is not being evasive, necessarily — they may just never have been asked. But you need the answer before delivery, not after.

Step 5: Inspect the three systems that actually fail

Whole-rig photographs are marketing. They tell you the paint is new. They tell you nothing about whether the machine will still be drilling in year six.

Watch these three:

  1. Hydraulics. Look for weeping fittings, chafed hose runs, and evidence of recent re-termination. Pull a fluid sample if the machine has hours on it. It costs almost nothing and it will tell you more than the hour meter.
  2. Mast and feed system. Weld inspection at the joints, pin and bushing wear, and whether the mast raises and lowers smoothly under load. Uneven travel shows up here first.
  3. Rotation head. Run it. Listen to it. Check for play and for gearbox noise under no-load and under load.

If you cannot get to the machine, get a live video walkthrough with someone operating it in real time. Recorded video is fine for confirming the model. It is useless for confirming condition.

Step 6: Price the parts path, not just the rig

Here is where I will admit to a bias. A rig is a fifteen-year asset and a purchase decision is a five-minute comparison of the same number on two quotes. The number that matters is not the invoice. It is the invoice plus every part you will buy in the first three years.

Ask for: the consumable and wear-part list with current lead times, whether those parts sit in a regional stock location or ship from the factory, and who performs service in your area. Get the lead time in writing. “Usually a couple of weeks” is not a lead time, it is a hope.

On refurbished versus new — I have gone both ways. The upside of refurbished was roughly 40% off a comparable new unit. The risk was that the refurb scope did not include the hydraulic system, and I would not find out until month eight. I kept asking myself whether the discount was worth potentially eating a system rebuild inside the first year. What settled it was requiring the refurb scope in writing, itemized. Two vendors could produce that document. One could not. That was the whole evaluation.

Step 7: Lock down the documentation package before delivery

This is the part that gets negotiated last and matters most, because it is what you have left when the salesperson moves to a different territory.

The package should include: operator and maintenance manuals, hydraulic and electrical schematics, a spare parts manual with part numbers, the as-built configuration sheet, and any available service history. Add training hours and a named contact for technical questions.

So glad I insisted on schematics on a rig we took delivery of in 2023. Our field crew traced a control fault in about four hours using the electrical drawing. Without it, that job would have run into a second shift and a rental. Almost skipped the request because the vendor said the drawings were “standard” and would come with the machine. They did not come with the machine. They came three weeks later, after I asked twice.

Step 8: Ask the vendor what they do not do

This is the step that separates a real evaluation from a checklist you fill out to feel thorough.

Ask directly: what parts of this project are outside your scope? A good answer names specific things — site geotechnical work, foundation design, non-drilling equipment, mobilization in terrain they do not service. A bad answer is “we can handle all of it.”

Nobody builds rigs, does geology, pours foundations, and runs logistics at the same level of quality. A supplier who tells you where their competence ends is telling you something useful about the rest of it. The vendor who said “this is not our strength — here is who does it better” earned my trust for everything else on the page.

Common mistakes in this process

  • Accepting “the manager confirmed it” in place of a document. Verbal scope belongs nowhere in a rig purchase.
  • Letting an availability guarantee into the contract. If a proposal promises zero downtime or 100% availability, treat that as a signal about how the rest of the proposal was written, not as a feature.
  • Using whole-machine photos as an acceptance criterion. They confirm identity. They do not confirm condition.
  • Mismatching power supply and site. An electric rig on a site without adequate grid capacity is an expensive static display.
  • Leaving parts lead times out of the contract. The purchase price is a one-time number. Lead time is a recurring one.

Work the eight steps in order. Step 1 takes ten minutes and prevents the kind of error that takes a lawyer to fix. Steps 2 and 3 take an afternoon and prevent the kind of error that takes a crane to fix.

Previous: Buying an Atlas Copco Compressor: 8 Questions I Answer Before the PO Goes Out
Next: Why I Read Every Derrick Spec Twice Before Signing the PO

Discuss this screening note

Share your related duty question and Sweco will connect the topic to your plant conditions.

Ask an engineer